This project plans to construct two container berths and one tugboat dock. The shoreline of the dock is 680m long, with a water-break of about 2.2km long (of which the main water-break is 1.8km), an approach channel with a length of about 9km and a water depth of -16.5m, a...
As the company's first large-scale EPC framework project in Cameroon, the Kribi Deep Sea Port Phase I Project, Cameroon obtained 85% of the funds from the double preferential loans of the China EXIM Bank and 15% as the supporting funds from the state of Cameroon. The project c...
The investment is made to construct Wharf F1 and Wharf F2 and the construction mainly covers: 1. Wharf wall structure: 2000m-long and 500m-wide Wharf F1 + Wharf F2, with a water depth of -18.5m, which can handle container vessels with a capacity of 18,000TEUs or above. 2. C...